| 1 |
Status of Post-Monsoon 2023 monitored drains discharging into river Ganga and its Tributaries |
|
| 2 |
Status of Pre-Monsoon 2023 monitored drains discharging into river Ganga and its Tributaries |
|
| 3 |
Status of Post-Monsoon 2022 monitored drains discharging into river Ganga and its Tributaries |
|
| 4 |
Status of Pre-Monsoon 2022 monitored drains discharging into river Ganga and its Tributaries |
|
| 5 |
Status of Post-Monsoon 2021 monitored drains discharging into river Ganga and its Tributaries |
|
| 6 |
Status of Post-Monsoon 2020 monitored drains discharging into river Ganga and its Tributaries(Banganga Ramganga, Kali-East, Pandu, etc.) |
|
| 7 |
During pre and post monsoon, 2018, variation in the flow and biological load of priority drains flowing in the Ganges river was observed |
|
| 8 |
Prioritized drains were discharged into the main drains of the Ganges River and its tributaries during the pre-monsoon, 2018 |
|
| 9 |
Monitoring of priority drains during inspection of main stem of Ganga river and its tributaries during 2016 monsoon (October to December) |
|